Possible CauseSuggested Remedy
Overpacking material in moulda. Decrease first stage injection pressure
b. Decrease boost time
c. Decrease injection forward time
d. Decrease packing pressure
e. Increase injection transfer position (to lower injection peak pressure)
Improper finish on mouldDraw polish mould to proper finish
Insufficient draft on cavities and spruePolish and provide maximum allowable draft
Knockout system poorly designeda. Redesign knockout system for balanced ejection forces
b. Review operation of knockout system, plates not opening in proper sequence
Core shifting and cavity misalignmenta. Realign cavities and cores
b. Add interlocks to mould halves
Undercuts in mould and possible surface imperfectionsa. Repair and polish
b. If undercut is intentional, redesign or reduce
Non-uniform cavity pressure in multi-cavity mouldRedesign runners and gates for balanced filling of cavities
Moulded parts too hot for ejectiona. Increase cooling time
b. Decrease melt temperature
c. Decrease mould temperature
Moulded parts sticking to stationary half of moulda. Redesign sprue puller
b. Apply mould release
c. Increase nozzle temperature
d. If parts remain on wrong side of mould, undercut other side or try differential mould temperatures
Possible CauseSuggested Remedy
Melt temperature too lowIncrease melt temperature
Mould temperature too coldIncrease mould temperature
Injection pressure too lowa. Increase first stage pressure
b. Increase boost time
c. Increase injection speed
Insufficient feeda. Increase shot size to maintain a constant cushion
b. Inspect non-return valve for wear
Insufficient injection forward timea. Increase injection forward time
b. Increase injection rate
Entrapped air causing resistance to filla. Provide proper venting
b. Increase number and size of vents
Restricted flow of material to cavitya. Increase gate size
b. Increase runner size
c. Use nozzle with larger orifice
Unbalanced flow to cavity in multi-cavity moulda. Increase gate size
b. Redesign runner to provide balanced flow
Possible CauseSuggested Remedy
Material too hota. Decrease melt temperature
b. Decrease mould temperature
c. Lengthen cycle time
Injection pressure too higha. Decrease injection pressure
b. Decrease boost time
c. Decrease injection rate
d. Increase transfer position (to lower injection peak pressure)
Excessive packing of material in cavitiesDecrease packing pressure
Projected area too large for available clamping forceUse larger tonnage machine
Mould clamping pressure not properly adjusteda. Increase clamping pressure
b. Check mould parting line for obstruction
c. Check platen parallelism
Uneven or poor parting line and mating surfacesa. Remove mould, carefully inspect and repair parting lines, cavities and cores which do not have positive shut off
b. Add support for mould cores and cavities
Non-uniform cavity pressure due to unbalanced fillinga. Balance/increase runner and gate sizes to obtain uniform filling
b. Properly balance cavity layout for maintaining uniform cavity pressure